Weed Control
Passed by the town at the April 30th town meeting!!  Thank you all that showed up and voted!

 

 

MassPike
Massachusetts’ Turnpike Project Update Mr. Michael Mazeika, current Cedar Lake Association’s Treasurer, has taken on the role of Association’s contact with the Massachusetts Turnpike Project. Following is his update:

  • Spillway repair (discussion 6/30/2006) consultant to be hired by Pike by end of July. CLA will be a priority. I need to forward pictures of any contamination in the North end of the lake to Mr. Rick McCullough (Director of Environmental Engineering) for his files. I have some pictures, but other input would be appreciated.
  • The Massachusetts Turnpike is getting pressure from other environmental organizations regarding storm water runoff. There are several “pilot test projects” (storm drain filtration systems) that I am pushing to have CLA as a primary test site. This is where the letter to our Congressman with multiple signatures will help .
  • I have asked to be put on mailing list this fall for Pike grant money that is available.
  • I consistently bring up the long term goal of having the Pike pay for the dredging of the North end of the lake.
  • He mailed me the site for a report on Massachusetts Year 2006 Integrated list of waters report (clean water act): http://www.mass.gov/dep/water/resources/tmdle.htm. I have pulled a copy and CLA is categorized as a 4c meaning we have water impact issues, but nothing has been done yet. Pages 1 - 34 and page 183 as the Massachusetts’ Turnpike Project Update rest are tables that do not apply. Sections that do apply, page 10 - 12, Nonpoint Source Program. Pages 20 - 24 describes the types of problems and categories that waterways were placed in.

 

 

 

 

   
   

 